The comfort of family
The development of a sophisticated control system for an iconic home in Melbourne’s leafy suburbs...
Read MorePosted by Sarah Rix | Mar 9, 2023 | AIRAH, Features, Sustainabilty
The development of a sophisticated control system for an iconic home in Melbourne’s leafy suburbs...
Read MorePosted by Chloe Sofia Gawaran | Mar 7, 2023 | Features, Sustainabilty
For more than 30 years, 101 Collins Street has remained one of Melbourne’s most prestigious office...
Read MorePosted by Shahzuma Warakhwala | Mar 7, 2023 | Cover feature, Cover story, Features
Canberra Grammar School’s new Snow Concert Hall features a subterranean design boasting an...
Read MorePosted by Shahzuma Warakhwala | Dec 22, 2022 | AIRAH, Cover feature, Cover story, Features
Some building owners are happy if their edifice performs adequately. For those making decisions...
Read MorePosted by Chloe Sofia Gawaran | Dec 21, 2022 | Features
Fantech has recently moved into a new Group HQ, close to its previous premises in Melbourne’s...
Read MoreMar 13, 2024
Perth-based Evan Pratt, Affil.AIRAH, is residential HVAC project engineer and estimator for Consolidated Energy.
Mar 13, 2024
Mitsubishi Heavy Industries Air-Conditioners Australia (MHIAA) has announced the launch of its innovative Ciara compact wall-mounted split system, complete with built in wi-fi control.
Mar 13, 2024
Designed by Elenberg Fraser 6 Charles Street, or C6, has been and is being developed by Grange Development. It primarily consists of residential apartments, although the plans also include a 500m2 edible rooftop garden and dining and entertainment spaces. Residents will also have access to a car-share scheme that includes 80 Tesla electric vehicles.
Mar 13, 2024
Company values go beyond mere words on a page, writes Professor Gayle Avery.
Mar 13, 2024
As I reflect on my personal journey with AIRAH over the past seven years, it’s clear that the past six months have been transformative.
Mar 13, 2024
The adoption of a prefabrication strategy in the design and construction of mechanical services systems at the new Victorian Heart Hospital solved numerous challenges associated with the build and project timelines.
Advertisement