Electrifying Existing Edifices Efficiently
The GBCA has issued some practical advice about electrification of the existing building stock,...
Read MorePosted by Chloe Sofia Gawaran | Nov 7, 2022 | Industry eye
The GBCA has issued some practical advice about electrification of the existing building stock,...
Read MorePosted by Mark Vender | Nov 4, 2022 | Industry eye
We wish to make a correction and clarification regarding the “Arch of triumph” article that...
Read MorePosted by Shahzuma Warakhwala | Nov 2, 2022 | Industry eye, Member profiles
Ecolibrium shoots the breeze with the Newcastle-based CTO of Airconnect about life after CSIRO....
Read MorePosted by Chloe Sofia Gawaran | Oct 31, 2022 | Industry eye
Alan Obrart, L.AIRAH, wonders why the bottom line is so thin for those HVAC businesses that detect...
Read MorePosted by Chloe Sofia Gawaran | Oct 31, 2022 | Industry eye, Sustainabilty
Located in South Korea’s capital, the HQ for a luxe fashion brand boasts several sustainability...
Read MoreMar 13, 2024
Perth-based Evan Pratt, Affil.AIRAH, is residential HVAC project engineer and estimator for Consolidated Energy.
Mar 13, 2024
Mitsubishi Heavy Industries Air-Conditioners Australia (MHIAA) has announced the launch of its innovative Ciara compact wall-mounted split system, complete with built in wi-fi control.
Mar 13, 2024
Designed by Elenberg Fraser 6 Charles Street, or C6, has been and is being developed by Grange Development. It primarily consists of residential apartments, although the plans also include a 500m2 edible rooftop garden and dining and entertainment spaces. Residents will also have access to a car-share scheme that includes 80 Tesla electric vehicles.
Mar 13, 2024
Company values go beyond mere words on a page, writes Professor Gayle Avery.
Mar 13, 2024
As I reflect on my personal journey with AIRAH over the past seven years, it’s clear that the past six months have been transformative.
Mar 13, 2024
The adoption of a prefabrication strategy in the design and construction of mechanical services systems at the new Victorian Heart Hospital solved numerous challenges associated with the build and project timelines.
Advertisement